Blog intended to share the FEMA Quick2 DOS software now packaged with the DOSBOX emulator to run on Windows. This software is used for establishing base flood elevations (BFE) using GIS software.
[DISCLAIMER]
Sunday, September 22, 2024
FEMA Out-by-LiDAR
Saturday, April 6, 2024
Two agencies with three national programs converge within GIS...
Two agencies with three national programs converge within GIS and fill a void in risk mapping. USGS 1M DEM access on The National Map (TNM), USGS StreamStats, and FEMA National Flood Hazard Layer (NFHL). The GIS software used for development is QGIS (Quantum Geographic Information System). The process also supports a second FEMA effort known as Base Level Engineering (BLE).
A current GIS method and process built around the DOS program Quick2 as published by FEMA to compute water-surface elevations in open channels of all types. The Quick-2 Tutorial exposes the user to single-lot and multiple-lot case studies. The DOS program has been combined with DOSBox, a free and open-source emulator that runs software for MS-DOS compatible disk operating systems, primarily video games.
Quick2 requires inputs measured by standard GIS methods and discharge values that can be provided by StreamStats and Base Level Engineering resources. A spreadsheet is then used to collect measurements and values formatting a text file input for Quick2. Another national layer used is USGS Landcover that provides the bases for Manning's N values needed in the calculation.
ITS HERE!!! Project Download
The National Map, a collaborative effort led by the U.S. Geological Survey (USGS), plays a crucial role in providing topographic information for the United States.
StreamStats is a powerful web application that provides essential streamflow statistics and other hydrological information.
The National Flood Hazard Layer (NFHL) is a geospatial database maintained by the Federal Emergency Management Agency (FEMA).
FEMA Base Level Engineering (BLE) is an automated riverine hydrologic and hydraulic modeling approach that builds on lessons learned to produce a base line understanding of a community’s flood risk.
Thursday, November 2, 2023
National Flood Risk Managment - Historical Document
IMPROVING PUBLIC SAFETY –
FROM FEDERAL PROTECTION TO SHARED RISK REDUCTION
Major General Don Riley
US Army Corps of Engineers
2/26/2008
Responsibility for flood risk management in the United States is a shared responsibility between multiple Federal, State, and local government agencies with a complex set of programs and authorities. Nationally, both the US Army Corps of Engineers (USACE) and the Federal Emergency Management Agency (FEMA) have programs to assist states and communities in reducing flood damages and promoting sound flood risk management. The authority to determine how land is used in floodplains and to enforce flood-wise requirements is entirely the responsibility of state and local government. Floodplain management choices made by state and local officials, in turn, impact the effectiveness of federal programs to mitigate flood risk and the performance of federal flood damage reduction infrastructure. One key challenge is to ensure that as the public and government leaders make flood risk management decisions, they integrate environmental, social, and economic factors and consider all available tools to improve public safety. Importantly, we must ensure the public is educated both as to the risks they face and actions they can take to reduce their risks. Because of this complex arrangement of responsibilities, only a life cycle, comprehensive and collaborative systems approach will enable communities to sustain an effective reduction of risks from flooding.
Where we are now – “The government will protect us.”
Individual agency processes and procedures typically have provided the venue for planning and implementation of flood damage reduction measures. The present process to engage the Corps of Engineers is on a project-by-project basis, even though the Corps has made advances in incorporating collaborative approaches and assessing alternatives in a watershed context. Traditionally, the Corps focuses on reducing flood damages by managing floods that cause damage largely by decreasing the probability of flooding. The Corps develops alternatives based on reducing known potential flood damages, with minimal consideration of future land use or other social effects. Additionally, the Corps infrequently assesses options to reduce consequences should a failure occur. Whether communities strive for 1% level of protection or greater, the present process drives decisions based on reducing the potential for failure or reducing flood damages and does not incorporate an assessment of localized risks and consequences. Figure 1 is an example of the present paradigm – a system based on an appropriate “level of protection”, which provides credence to the notion that “the government is responsible” and “therefore, we are protected.” Complicating the matter, many prudent costs share sponsors seek to limit their costs, which drives some to seek to achieve only a level of protection whereby community members will not be required to purchase flood insurance.
Figure 1 – Selecting Level of Protection.
Where we
need to be – “We are all responsible for our safety.”
To
significantly improve public safety, we are pursuing a level of public
education at which our fellow citizens are so well informed they are able to
assume responsibility for decisions they make about where and how they want to
live and work. We then can engage in a comprehensive and multi-government and
private citizen collaborative process to managing flood risk to achieve levels
of tolerable risk. The Corps is expanding our traditional approach to focus on
the most effective combination of tools available that citizens may use to
lower or “buy down” their flood risk (as illustrated in Figure 2). We will
consider not only reducing the probability of flooding, but also reducing the
consequences should a flood occur. A multitude of options and tools becomes
more evident through the process of assessing the consequences of a flood.
Furthermore, the decision on which tools to implement involves all
stakeholders. For example, the Corps can help reduce risk by levee
construction. Whereas in a coordinated but independent action, local government
can further reduce flood risk by implementing flood plain management actions
such as evacuation plans, zoning ordinances, and public outreach.
Figure 2 – Flood Risk Management: All Stakeholders Contribute to Reduce Risk.
What we
are doing now
In May 2006,
USACE established the National Flood Risk Management Program (NFRMP) to take
the first step of bringing together other federal agencies, state and local
governments and agencies, and the private sector to develop and implement a
unified national flood risk management strategy that eliminates conflicts
between different flood risk management programs and takes advantage of all
opportunities for collaboration. Additionally, we are seeking partnerships with
those that best understand risk, such as banking and insurance industries to
share data and risk model development. We also wish to collaborate more closely
with business councils and developers so they understand local flood risks and
can assist us in public education campaigns.
An integral part of the NFRMP is the Interagency Flood Risk Management Committee (IFRMC), with core leadership from USACE, FEMA, Association of State Flood Plain Managers (ASFPM), and the National Association of Flood and Stormwater Management Agencies (NAFSMA). This committee will be expanded to include other stakeholder groups, such as resource agencies. Through this process, organizational leadership should use or change, when practicable, existing policies and programs to transition into a comprehensive and shared process of lowering or “buying down” flood risks. As the transition occurs, the IFRMC should identify and recommend necessary administrative, policy, and legislative changes for complete implementation of the collaborative risk-informed decision process for managing flood risks.
Featured
FEMA Quick2 DOS Program
Quick2 is DOS based software created by the Federal Emergency Management Agency (FEMA) published with FEMA 265 - MANAGING FLOODPLAIN DEVELOP...
-
Using LiDAR For Map Amendments LiDAR data can replace the requ...
-
The "Q" in QGIS stands for "Quantum." The name "Quantum GIS" was chosen by its founder, Gary Sherman, when he ...
-
Took my recent task list that was performed in my recent collage class and entered into ChatGPT (free version) without prompting the output....